LH installation in Romania

LH installation in Romania

Good work by our dealer Florin in Romania.

Click here for a video of this PowerSpout LH and MC250 MPPT.

Florin always does a perfect job. Note the silty water on this site, we hope the new cutlass bush combined with the reversible shaft will give the longest life possible for this kind of turbine in silty water.

Also note the steel frame used to convert the pipe pressure to head. This way the large PVC feeder pipe can lay supported on the river bank