Triple PLT install in Scotland
Hugh Piggott recently advised and supplied equipment on this job. An off-grid system with three turbines powering three spearate dwellings using a single penstock made from surplus MDPE pipe.
It is a very interesting read. Please take the time to read the comprehensive case study.