by Michael Lawley
Hugh Piggott recently advised and supplied equipment on this job. An off-grid system with three turbines powering three spearate dwellings using a single penstock made from surplus MDPE pipe.
by Michael Lawley
We are still seeing some installation pictures where the details of manifold design are not as good as they could be.
by Michael Lawley
I recently advised that we were experimenting with lifting our PLT turbine rating from 1.6kW to 2.0kW.
by Michael Lawley
Our dealer Chris in Kenya has been supplying equipment for remote installs in the Rift Valley, this install is at 7500 feet.
by Michael Lawley
I recently got an email request from a USA dealer asking how to determine one magnetic rotor from another.